The universal grinder use regulations and swing particles machine maintenance
Universal grinder use regulations
  Universal grinder are hopper bucket outside of the following feed regulation flapper should adjust the flapper to the blanking size, according to the degree of friability of the material and the grinding fineness, indeed when the position and tighten .
  The universal grinder beneath the discharge port, if the discharge of the amount of material wind caused slightly spray material phenomenon, should be in a material bag plus port bundling material by Higuchi bag slowly spillover.
  Should be carried out before the first boot once empty running test, commissioning should be preceded by checking the universal grinder sites to confirm whether the universal grinder qualified.
  Universal grinder has a water-cooled, plus use should be used to avoid damage to the bearings.
  The universal grinder installation and debugging
  1. Fixed-gear Imperial the Imperial went bolts can.
  2 fold the Royal universal grinder bearings, first open cavity, the Royal derotation chainring or rotary knife, take away the maze and the center bearing cap, then Imperial to the outer end of the pulley and bearing cap, which launched both ends of the axial Imperial go to both ends of the bearing and shaft.
  Installation still keep the alignment of the the shaft cavity bush hole oil eye.
  Install universal grinder screen sieve circle close to the machine cavity shoulder tank, otherwise damage sieve circle when the door is closed.
  5. Making universal grinder sieve ring, mesh expand the length should be the root noted in the sieve circle shoulder sized screen damage manufacturers should be equipped to do.
  Install universal grinder screen: the two sieve Circle merged alignment mark and then sieve into within the sieve circle, such as the mesh too tight, then push out the screen inward curved into can.
  Rock particles maintenance methods:
  (1) Swing particle the machine lubrication: lubrication cycle refueling time: ① general parts per run three days; ② The Rolling 1 # calcium based grease every 3 months.
  (2) rock particles maintenance
  1) maintenance cycle: (1) motor: checked once a month; ② each class using the time of the rock particles the machine overall seized enterprises.
  2) maintenance of content:
  (1) periodically check the reliability of the insulation resistance of the rock particles machine electrical system components and the control loop and then zero, to ensure the safe use of electricity;
  ② check swing particles machine parts on a regular basis (monthly - the times), check whether the active portion of the worm, worm, bearings and other rotating flexible and wear, discovered defects should be repaired in time, may not continue to use;
  ③ the transmission part of the rock particles should all drive, refueling time, add the midway may be part of the operation;
  ④ worm gear box to be long-term storage of oil, the oil surface height worm gear fully immersed in oil, the continuous use of the aircraft, the required oil change every three months;
  ⑤ before rocking operation of the pellet machine idling confirm normal run, well-oiled, before normal operation;
  When you and ⑥ swing particles machine after use or lockout time, you should remove the rotating drum cleaning brush cleared the remaining flour sub in the bucket, and then properly installed, ready to work for the next;
  (7) if a longer time to discontinuation must swing the particle machine clean.
Related News:
· Innovation, energy saving, environmental protectio  
· Vacuum dryer product performance characteristics a  
· Vacuum dryer used for inspection and debugging wor  
· Difficulties and reasons cannot start mixing machi  
· The correct operation method using vacuum dryer  
· Development advantages and characteristics of dome  
· The difference between the special vacuum dryer an  
· Detailed description of each component characteris  
· The dominant position in the whole vacuum dryer dr  
· Trough type mixer sometimes appear large area leak  
Related Products:
· PGL Spray Drying Granulator
· High speed mixer
· SET series double screw extrusion pelletizer
· VI forced mixer
· Mixing machine W series
· Powder machine ZSJ series vibrating screen
· FZ series of crushing granulator
· Chinese medicine grinder
· DWT series of drier for dehydrated vegetables
· Multi-layer belt dryer

Copyright 2013 Chang Zhou Zhizun Machinery Co.,Ltd All Rights Reserved.Design by Reach.
Tel:86.519-88906508 Fox:86.519-88902679 Add:Jiaoxi Changzhou Jiangsu Pro China P.C:213116

主站蜘蛛池模板: 日日摸天天摸97狠狠婷婷| 亚洲伊人情人综合网站| 人妻三级日本三级日本三级极| 婷婷久久综合九色综合88| 中国大陆高清aⅴ毛片| 13小箩利洗澡无码视频网站| 丰满人妻无码专区视频| 久久狠狠爱亚洲综合影院| 精品国产第一国产综合精品| av鲁丝一区鲁丝二区鲁丝三区| 国产a精彩视频精品视频下载 | 人妻熟女一区| 成人区人妻精品一熟女| 亚洲精品欧美综合二区| 农村乱人伦一区二区| 国产成熟女人性满足视频| 婷婷色中文字幕综合在线| 久久久国产精品无码一区二区| 免费人成网站在线观看不卡 | 一本久久精品一区二区| 亚洲日韩国产精品第一页一区| 日本乱人伦片中文三区| 亚洲欧美在线观看品| 中文无码字幕一区到五区免费 | 狠狠躁天天躁日日躁欧美 | 日日摸日日碰夜夜爽亚洲| 久久国产精品-国产精品| 天美传媒精品1区2区3区| 亚洲成本人无码薄码区| 亚洲日韩精品无码专区加勒比| 亚洲精品乱码久久久久久中文字幕| 久久天天躁夜夜躁狠狠综合| 国产成人av乱码在线观看| 亚洲国产精品综合久久2007| 国产精品日本亚洲欧美| 成人欧美一区二区三区在线观看| 2020国产精品香蕉在线观看| 久久婷婷人人澡人人爽人人爱 | 手机看片国产av无码| 成人免费视频高潮潮喷无码| 国产又色又爽又黄刺激视频|