国产亚洲欧美在线专区,四虎国产精品一区二区,四虎国产精品亚洲一区久久特色,亚洲综合欧美制服丝袜

How to properly install swing particles?
Rock particles machine installation instructions
  The rock particles machines for the entire packing, unpacking after moved to the appropriate use of local, pad level to use.
  Electrical circuit means is not subject to the restriction of the rotational direction, the line is clamped by the base below to switching, the cable card via the belt cover.
  1.1 before installing the first reference to the packing list check parts are complete and damage the rock particles.
  1.2 installation, refer to the installation diagram which rock particles machine supporting chassis must be mounted horizontally on the foundation, the foundation should have sufficient stiffness and strength to support the the vibrating screen dynamic load and static load.
  1.3 can take advantage of the screen box trunnion lifting screening machine, lifting the entire sieve can not be directly linked to the exciter.
  Should ensure that a class of non-moving parts of the screen box and hopper, chute kept to a minimum 75mm gap between 1.4 installed swing particles machine screen machine.
  1.5 swing the particle machine equipment installed, maintained around the screen surface level, otherwise, you can adjust the spring seat support pad thin sheet iron.
  1.6 springs must be in a vertical state, the spring fixation in the sieve box of the trunnion.
  1.7 the vibration sieve drive direction given is standing on the feed side, face the direction of the flow of material, observed the motor position, the left-hand side to the left to the driver, the right-hand side for the right to drive. The vibrating screen with symmetrical design, both sides pulley. Replace the motor position to change the direction of the left and right drive.
  1.8 to ensure that the tension of the V-belt has a sufficient amount of adjustment the two pulley end surface adjustment in a plane.
  The 1.9 swing particles machine before the trial must be by hand (or other) rotating exciter. Flexible rotation, the jamming before starting rock particles.
  No-load commissioning, should be less than 2 hours after the end of the installation and adjustment of 1.10 rock particles, smooth operation, no abnormal noise bearing maximum temperature does not exceed 75 ° C.
  Rock particles machine instructions
  1. Use: starting rock particles, the mixture was poured into a hopper, and by the the rotating drum swing, squeezing the material through a screen to form particles, such as crushed pieces, should be added gradually, not fill, in order to avoid pressure is too large the screen wearing. 2. Note: Hopper as powder stop high, must not spent shovel, avoid hand injury accident, application of bamboo shovel or parking.
  Rock particles machine maintenance instructions
  1. Periodically check the parts, once a month, check the worm gear, worm gear, bearing and active part of the flexible and wear, discovered defects should be repaired in time, shall not be reluctant to use.
  2. Rock particles machine should be placed on a clean dry indoor atmosphere acids and its parts shall not contain corrosive gases flowing places.
  3. The rock particles machine after use or lockout, wash or brush cleared bucket remaining powder will remove the rotating drum, and then properly installed and ready to work for the next.
  4. Disable a longer time, must be rock particles systemic wipe clean parts of the glossy coated with anti-rust oil with a cloth booth
Related News:
· Innovation, energy saving, environmental protectio  
· Vacuum dryer product performance characteristics a  
· Vacuum dryer used for inspection and debugging wor  
· Difficulties and reasons cannot start mixing machi  
· The correct operation method using vacuum dryer  
· Development advantages and characteristics of dome  
· The difference between the special vacuum dryer an  
· Detailed description of each component characteris  
· The dominant position in the whole vacuum dryer dr  
· Trough type mixer sometimes appear large area leak  
Related Products:
· PGL Spray Drying Granulator
· High speed mixer
· SET series double screw extrusion pelletizer
· VI forced mixer
· Mixing machine W series
· Powder machine ZSJ series vibrating screen
· FZ series of crushing granulator
· Chinese medicine grinder
· DWT series of drier for dehydrated vegetables
· Multi-layer belt dryer

Copyright 2013 Chang Zhou Zhizun Machinery Co.,Ltd All Rights Reserved.Design by Reach.
Tel:86.519-88906508 Fox:86.519-88902679 Add:Jiaoxi Changzhou Jiangsu Pro China P.C:213116

主站蜘蛛池模板: 亚洲成a人片在线观看无遮挡| 国产午夜无码片免费| 老汉色老汉首页a亚洲| 最新国产aⅴ精品无码| 久久久av波多野一区二区| 一道久在线无码加勒比| 色拍拍在线精品视频| 国产成人综合日韩精品无码| 97久久久综合亚洲久久88| 欧美成人一区二区三区片免费| 牲欲强的熟妇农村老妇女| 一区二区三区精品视频免费播放| 国产孩cao大人xxxx| 亚洲国产精品成人综合色| 精品成人免费一区二区不卡| 亚洲图片小说激情综合| 国内精品久久人妻朋友| 亚洲精品无码久久久久sm| 亚洲欧美国产精品久久久久久久| 日本国产成人国产在线播放| 亚洲欧美综合精品成人导航| 亚洲精品久久久久一区二区| 漂亮人妻中文字幕丝袜| 18禁无遮挡羞羞污污污污网站| 亚洲一区二区三区四区五区黄 | 亚洲成av人片不卡无码久久| 日韩a片无码一区二区三区电影 | 国产午夜亚洲精品理论片八戒| 国产六月婷婷爱在线观看| 老熟女高潮一区二区三区| 国产亚洲日本精品无码| 免费无码十八禁污污网站| 久久人人97超碰caoporen| 亚洲一区二区三区日本久久九| 爆乳喷奶水无码正在播放| 国精产品一二三区精华液| 亚洲另类激情专区小说图片| 综合久久国产九一剧情麻豆| 国产美女自慰在线观看| 日日噜噜夜夜狠狠久久丁香五月 | 久久亚洲精精品中文字幕 |